WANT AN APPROXIMATE PRICE?
GET A FREE QUOTE »

CALL US TODAY:
843-397-8000

This was an 8 acre undeveloped track of land turned Into a Coastal Carolina off-campus housing. The duration of this project was 4 months

This work included the furnishing of all material, labor, and equipment Necessary to complete the construction of an approximately 16 acre soil cap Over the active landfill.

This project consisted of clearing, grading, asphalt drives and parking, Curb and gutter and underground utilities including fire protection, Water, sewer, power and concrete sidewalks.

This was a fast track 47 lot subdivision located in South port, North Carolina. We were able to complete This project in under 3 months.

During this project we had to work closely with the city Of Myrtle Beach and SCDOT. While on this project we Had to install a DOT turn lane. The turn lane was completed During the night.

This project consisted of laying 20,000 LF of storm Drain through out the existing high school in 90 days. We completed This project before the 90 days dead line.

© 2019 King Construction Services, Inc.